Architecna Engineering S.r.l

. development of tram lines

Next-generation tramway construction

Future-oriented design

We are a leading firm in Italy for tramway design and construction. Our vision is to create an urban energy line—a silent connector that reshapes the cityscape and enhances its usability for everyone, every day.

 

Designing and construction of modern, efficient tramways makes public transport sustainable, high-performing, and fully integrated. Through technical expertise, operational efficiency, and the ability to anticipate change, we design complex systems and chart routes that improve people’s mobility.

 

From preliminary studies to final design, we envision tramways with sustainable logic and artisanal precision, working on low-impact solutions that seamlessly integrate with the surrounding urban environment.

 

Some of our most representative tramway projects:

Tram lines

Florence Tramway – Line 3.2 Lot 1

Line 3.2.1: the new sustainable route between Florence and Bagno a Ripoli, where mobility and landscape travel in harmony.

Place Florence - Bagno a Ripoli, Italy

Service Final Project, Works Management (BIM), and Safety Coordination during the Design and Execution phases.

Period 2018–2022 (Design) / 2024–ongoing (Works Management)

View the project

Florence Tramway – Line 3.2 Lot 2

Florence moves better: less traffic, more connections, zero compromises for the environment.

Place Florence, Italy

Service Final Project (BIM) and Safety Coordination during the Design Phase

Period 2022 - 2025

View the project

Florence Tramway - Lines 2 and 3.1

Florence on tracks: the tramway that connects the city to its future.

Place Florence, Italy

Service Works Management and Safety Coordination during the Execution Phase, Head of Works.

Period 2014 – 2022

View the project

Florence Tramway - VACS Lot 2

VACS Lot 2: the future of sustainable mobility in the heart of Florence.

Place Florence, Italy

Service Revised Final Project, Works Management, and Safety Coordination during the Design and Execution phases.

Period 2019-2021 (Design) / 2022-ongoing (Works Management)

View the project

Florence Tramway - Line 2.2

The new tramway line that redefines mobility in the northwest area of Florence.

Place Florence - Sesto Fiorentino, Italy

Service Technical-Economic Feasibility Project, Final Project, and Safety Coordination during the Design Phase

Period 2024 – ongoing

View the project

Florence Tramway - Line 4.1

The connection that mends Florence, uniting neighborhoods and future visions.

Place Florence, Italy

Service Final Project and Safety Coordination during the Design Phase

Period 2020-2021

View the project

Florence Tramway – Line 4.2

The tramway that brings Florence and Campi closer, a concrete step towards a connected metropolitan city.

Place Campi Bisenzio, Italy

Service Technical-Economic Feasibility Project for an Integrated Contract and Safety Coordination during the Design Phase

Period 2019-2022

View the project

Florence Tramway – T1 Line Extension, Northern Section

A short but strategic infrastructure: a line that connects health, knowledge, and the urban future.

Place Florence, Italy

Service Technical and Economic Feasibility Study

Period 2024 – ongoing

View the project

Bologna Tramway - Red and Green Lines

Red and Green Lines: the new urban fabric of Bologna, where sustainability, efficiency, and beauty travel together.

Place Bologna, Italy

Period 2023 – ongoing

View the project

Bologna Tramway - Red Line

A line that doesn't just cross the city, but reinvents it: fluid, silent, connected. The Bologna of tomorrow runs on red tracks.

Place Bologna, Italy

Service Technical-Economic Feasibility Project, Final Project (BIM)

Period 2018 - 2021

View the project

Bologna Tramway - Green Line

Green Line: the sustainable breath that crosses Bologna from north to south.

Place Bologna, Italy

Service Technical and Economic Feasibility Project, Final Project, Executive Project (BIM)

Period 2022 - 2025

View the project

Brescia Tramway T2

With T2, Brescia is not just laying tracks: it is charting the course for a closer, greener, and more connected future. A decisive step toward a city that moves better and lives better.

Place Brescia, Italy

Service Final Design (BIM)

Period 2022 - 2024

View the project

Brescia Tramway T3

A new tramway infrastructure that expands the network, connects neighborhoods, and helps shape a more accessible, sustainable, and resilient Brescia.

Place Brescia, Italy

Service Final Design (BIM)

Period 2022 - 2024

View the project

Reggio Emilia Tramway

From Mediopadana to Rivalta: the city’s new rhythm

Place Reggio Emilia, Italy

Service Technical and Economic Feasibility Design

Period 2024 - 2025

View the project

Pisa Tramway

A light yet powerful line: stitching together places of knowledge, care, and culture, shaping the Pisa of the future.

Place Pisa, Italy

Service Technical and Economic Feasibility Study

Period 2024 - 2025

View the project

Rome Ostia - Fiumicino railway

A new integrated mobility backbone, designed to connect territories, enhance the coastline, and propel Rome toward a more sustainable future.

Place Rome, Italy

Service Technical and Economic Feasibility Design

Period 2023 – ongoing

View the project

Rome tramway Giardinetti – Tor Vergata

Two new lines, one direction: transforming the urban landscape into a network of fast, quiet, and sustainable connections. Because the future of mobility in Rome is being built today, track by track.

Place Rome, Italy

Service Technical and Economic Feasibility Study

Period 2021 - 2024

View the project

Prato Tramway

The new backbone of metropolitan mobility between Florence and Prato.

Place Prato, Italy

Service Technical and Economic Feasibility Design

Period 2024 - 2025

View the project

Milan Tramway – Line 27 Extension

Milan Montecity–Rogoredo: a new tramway to connect the city and the future.

Place Milan, Italy

Service Preliminary Design, Final Design, and Detailed Design

Period 2019 – 2020 / 2022 – in corso

View the project

Messina Tramway

More than just infrastructure, an urban gesture that transforms mobility into landscape, giving Messina a new rhythm—smoother, more livable, and deeply its own.

Place Messina, Italy

Service Detailed Design, Construction Management

Period 1998 – 2002

View the project

Messina Tramway - Modernisation

A project of innovation and sustainability.

Place Messina, Italy

Service Preliminary Design, Final Design, Detailed Design, Construction Management

Period 2021 – in corso

View the project

Padua Tramway SIR3

SIR 3: Padua’s new green backbone.

Place Padova, Italy

Service Construction Management and Safety Coordination during Execution

Period 2023 – in corso

View the project

Bergamo Tramway T2

The T2 line is not just a transport infrastructure: it is an axis of urban regeneration, a bridge between the past and the future that combines technology, sustainability, and quality of life.

Place Bergamo, Italy

Service Executive design (BIM) in integrated contract

Period 2023 - 2024

View the project